Updated
Wednesday, January 26th, 2022
Generic selectors
Exact matches only
Search in title
Search in content

As part of its recently passed infrastructure bill, the Biden administration plans to spend $7.5 billion building 500,000 chargers for electric vehicles. But will drivers actually want to use those chargers?

The two biggest impediments to the widespread adoption of electric vehicles are the vehicles’ range and their upfront cost. Right now there are only five varieties of electric vehicles with a range of more than 350 miles per charge, and none of them retail for a base price of less than $47,000.

And while the Build Back Better Act passed by the House last month contains tax rebates for new electric vehicle purchases, none of the five qualify for the full amount. For comparison, a base model Ford Focus costs considerably less and can go further on a full tank of gas.

Conveniently placed vehicle chargers could mitigate the range issue: Ideally, a trip to a charger would simply replace a trip to the fuel pump. But the Biden plan is unlikely to fix this problem.

There are two types of public vehicle chargers, Level 2 and Level 3. (Level 1 uses a standard power outlet.) Level 2 chargers produce around 25 miles of range per hour, meaning that a full charge from empty could take five hours or longer. Level 3 chargers produce considerably more power, and can charge some vehicles from empty to 80 percent in as little as 15 minutes. But while Level 2 chargers cost less than $3,000 apiece, Level 3 chargers cost as much as $140,000 each to build.

There is no indication which the administration prefers, but if it plans to build 500,000 for $7.5 billion, it’s almost certainly going to have to settle for Level 2 chargers.

Read more at Reason.

Parent-led education revolution

Parent-led education revolution


January 25, 2022

Parent-led education revolution